Home / Problems we solve

Pricing ownership, data and alignment · 19 min read

Set your pricing rules before the ERP upgrade

A system upgrade is the best chance in a decade to build good pricing into the business. Designed first, the new system enforces it from day one.

No.6Irregular price lists, with missing items and legacy prices, is the sixth most frequently raised issue in our diagnostics, and it has been raised in every business we have measured.
A$19Margin the business earns on a A$100 sale after a A$5 discount when the true landed cost is A$76. The system, holding a cost of A$70, shows A$25. Illustrative.
A$6.8mEBITDA realised within 12 months at Staples after 60 price lists were replaced with one national price structure. Realised; the case is published on this site.

Source: Pricing Insight diagnostic issues register, drawn from staff surveys in building products, rural supplies, hardware retail and distribution, security hardware, medical products, office technology and coatings. Clients are described by sector and not named. The margin arithmetic is illustrative; the Staples figure is realised and published on this site.

In short
  • A new system multiplies whatever it is fed: clean data and clear rules, or old habits.
  • One cost and one price per item, in one home system, comes before automation. Pricing master data (element 57, Dq) and integrated pricing systems (element 59, Is) are where the work starts.
  • The fix is a pricing design agreed with sales and finance, handed to the integrator as a specification they can configure and test.

In Pricing Insight's diagnostics, the three issues an ERP project inherits, irregular price lists, unreliable margin and rebate data, and prices managed in spreadsheets outside the system, have each been raised in every business we have measured.

This page sets out what happens when pricing is left out of a system upgrade, what the diagnostic evidence shows, what one wrong cost does to a quote, what the pricing design has to contain, the elements of the Pricing Periodic Table that decide the problem, and the decisions, designs and routines that put pricing into the build rather than after it. It is written for the chief executive, the CFO and the sales director.

The question this page answers

We are about to replace our ERP. Which pricing decisions will the new system make, who has decided them, and what has to be cleaned up before the build starts?

01The upgrade is under way, and pricing is nobody's workstream.

Many businesses are replacing ERP and quoting systems that have run for a decade or more, often alongside a merger or a move to the cloud. In most of them, pricing is a line inside the finance or sales workstream, and nobody owns it. System integrators configure what they are given. Pricing design usually sits outside their scope, so the price files, discount rules and cost records of the old system are carried across as they stand. Mergers and system changes move price files and remove experienced people.

Six signs tell you the pricing design has not been done. The ERP project has a pricing workstream with no pricing owner. Current price files are being migrated as they are, special prices and all. Several cost prices exist for the same item. Discount approval rules are held in people's heads. Rebates cannot be shown at the point of sale. Customer price lists run to many pages and still need manual correction.

Left alone, migrating poor pricing logic locks it in. A new system multiplies whatever it is fed: clean data and clear rules, or old habits. If a product is filed in the wrong place, the right rule gives the wrong price on every quote. Reps work around the new system, spreadsheets return, and the investment delivers less than planned.

Some of these decisions are hard to reverse. Configuration decisions made in the build phase are expensive to change after go-live. Product hierarchies and customer tiers, once set, shape every margin report for years. A hierarchy with no level at which a price can be managed across a family of products forces every price change to be made item by item, and that is how price lists fall behind cost.

Recovery costs more than design. Reworking pricing after go-live means change requests, retesting and retraining, at a higher cost than designing it once. Where the system has already gone live on poor data, checking invoiced prices against agreed prices each month until the errors clear limits the damage.

Why it matters

An ERP upgrade is the one occasion when the business will rebuild its product tree, customer tree, cost records and approval rules anyway. Done with pricing in mind, the same work gives the business a floor the system enforces. Done without it, the same work carries ten years of exceptions into a system that will run for the next ten.

02Our diagnostics raise the data and price-list issues in every business we have measured.

Six issues from our register make up this problem. Irregular price lists, with missing items and legacy prices, is the sixth most frequently raised of the forty issues we code, and it has been raised in every business we have measured. So have unreliable margin and rebate data at the point of decision, and prices, quotes or rebates managed in spreadsheets outside the ERP. No defined price corridor was raised in seven of the eight businesses in our diagnostics, no discount authority matrix in six, and no line of sight from list price to pocket price in three: a building products group, a rural supplies co-operative and a coatings manufacturer.

Staff at a building products group with six business units described item master data as a shared responsibility among many people, with the errors that follow. At a security hardware manufacturer, sellers priced from a cost spreadsheet because the quote template was missing item codes, costs and list prices. At a hardware distributor, a product hierarchy built for reporting forced a choice between a consistent price and a correct report. At an office technology company, list prices sat in the quoting tool and any discount below them needed approval: the pattern the others were missing.

Master Data administration for (Item Masterfile) is a shared responsibility among a large number of staff so not as tight and less regulated (more open to errors).
Manual processes often result in mistakes such as incorrect pricing, wrong discount levels, misapplied freight charges, incorrect units/UOM, incorrect item categories and tenders dropping off.
The current SPA Template is difficult to use as the RRP and Cost Price are not always included or accurate, or the item codes and prices are missing from the SPA Template all together.
Staff comments from Pricing Insight diagnostic surveys, reproduced as written

Nobody owned the record. Costs were held in more than one place, so nobody could say which was right. Price lists came from one file and invoices from another, so the two drifted apart. Approval limits lived in memory, so the system could not enforce them. Each is a decision that was never made, and a new system will carry the gap across unless someone closes it first.

One business, sharpest

At a hardware distributor, discount structures sat on a product category level so fine that a new range crossing several categories carried different discounts and inconsistent list prices. Filing the products in one category fixed the price and broke the reporting. The hierarchy, not the people, was making the pricing decision.

03The arithmetic: a cost that is wrong by A$6 lets the wrong deal through.

One sale, two costs. Designed first, the system enforces good pricing from day one: approvals at quote time, floors that hold and margin reports the business can act on. Designed later, controls work on the wrong numbers. In the example below, the system shows a cost of A$70 for an item whose true landed cost with freight is A$76, because freight was never loaded against the item.

A seller quotes A$100 and gives a A$5 discount, so the invoice is A$95. Against the system cost of A$70, the margin is A$25 a unit, and the approval band for this product group is set at A$25, so the quote passes without a second look. Against the true landed cost of A$76, the margin is A$19, which is A$6 below the band. The deal that should have gone to a manager went through on the spot.

What the system showsA$25What the business earnsA$19
Figure 1. Margin per unit after a A$5 discount on a A$100 sale. Worked example: system cost A$70, true landed cost A$76. The A$25 passes a A$25 approval band; the A$19 should have been stopped. Illustrative; not a client result.

Scale the error. On a line selling 10,000 units a year, a A$6 gap between system cost and true cost is A$60,000 of margin the business believes it has and does not. A distributor with 500 such lines cannot tell which customers are profitable or which price rise is needed, and every control in the new system applies to the wrong figure. Where the system cost is too high instead, the business over-prices work it could have won. Neither error shows in the accounts, which use actual cost; both show in the quotes. Illustrative; not a client result.

The CFO's test

Pick your ten best-selling items. For each, write down the cost held in purchasing, the cost in the item master, the cost in the quote template and the landed cost in last quarter's actuals. If any item has more than one answer, the new system will inherit the disagreement. Then count last month's invoice lines for those items that fall below the margin band at actual cost.

04What good looks like: one home for every price, cost and term.

Six things, in order. Each is a design decision the business makes before the integrator starts. Together they are the pricing specification for the new system.

Each price, cost and customer term has one agreed home, and every other tool reads from it.

One item master holds one current cost. One customer master holds each customer's tier, terms and agreements. The quote tool, the price list and the invoice read from the same records. Spreadsheets may be used for analysis, never as a source.

Product and customer trees carry at least four levels, built for pricing decisions as well as reporting.

A family level at which a price rule can be applied across related items, and a customer level at which a tier can be applied across related accounts. The pricing design adds these levels before the data is loaded.

List-less-discount logic, price floors and stacking rules, with start and end dates on every contract and special price.

Every price is a list price less an earned discount, so the discount can be seen. A floor by product group the system will not invoice below. A rule for how discounts, rebates and promotions stack, so three concessions do not meet on one invoice. No agreement without an end date.

A discount authority matrix the system enforces at quote time, with no route around approval.

Who may approve what depth of discount on what size of deal, loaded as a rule the quote tool applies before the quote is sent, so an unapproved price cannot be invoiced. Rebates are visible at the point of sale, so the approval tests the margin the business will keep.

Customer price lists are produced, dated, cleaned, floored and tested against the last invoiced price.

Price lists come from the same records as the invoice, carry a date and a version, exclude dormant items, hold no price below the floor, and are checked against each customer's last invoice before they go out.

A named pricing owner carries the design through the transition and signs off the test.

One person owns the pricing specification from design to go-live and signs off the test that proves the system prices a known basket of quotes correctly. Without that person, the integrator decides.

Ron's view

"If a product is filed in the wrong place, the right rule gives the wrong price. One cost and one price per item, in one home system, comes before anything else." Ron Wood, founder, Pricing Insight.

05The elements of pricing capability that decide this problem.

Mapped to the Pricing Periodic Table, pricing before an ERP upgrade turns on ten of the 61 elements, in five domains, most of them in Systems & Controls and Price Architecture. Each needs a decision, a cleaned record or a written rule before the build begins. One test in B2B Pricing Insight (Pricing Insight, 2026) asks whether "discount authority is set out by level, with floors the system enforces"; an upgrade is the moment to make the answer yes.

ValuePeopleStructures
Customer Value
Vp
Df
Vq
Sv
Dr
Pricing Strategy
Ws
Po
Sg
Ot
Pp
Cm
Mi
Py
Np
Customer Agreements
Va
Rb
Ar
Tp
Rn
Management Alignment
Ed
Ca
Rs
Pn
Mc
Ch
Pricing Team
Pf
Rc
Cc
Market, Sales & Negotiation
Vs
Vt
Pb
Nu
In
Ng
Wa
Cn
Bt
Pv
Ka
Dd
Analysis & Processes
Ci
Wl
Pi
Or
Pr
Pm
Ps
Kp
Price Architecture
Lp
Md
Dt
Rl
Sx
Co
Tn
Bc
Systems & Controls
Dq
Qt
Is
Pl
Da

Elements this problem turns on. The Pricing Periodic Table has 61 elements in nine domains across Value, People and Structures; it is the map of B2B Pricing Insight.

ElementDomainWhat it looks like when it holds
57Dq Pricing master dataSystems & ControlsOne current cost and one price per item, each product and customer in one place in its tree, and an owner for the record
59Is Integrated pricing systemsSystems & ControlsOne home for each price, cost and term; the quote tool, price list and invoice read from the same records
60Pl Price-list publishingSystems & ControlsCustomer price lists produced from the same records as the invoice, dated, floored and checked against the last invoiced price
61Da Discount authority and controlsSystems & ControlsApproval limits enforced at quote time, so an unapproved price cannot be invoiced
58Qt Quoting speed and toolsSystems & ControlsA quote that flows to the order and the invoice without re-typing, with margin and approval status on the screen
54Co Price corridors and exceptionsPrice ArchitectureA floor by product group and customer tier loaded in the system, with every exception logged with a reason
55Tn True net pricePrice ArchitectureRebates, terms and freight visible at the point of sale, so the approval tests the margin the business will keep
46Pm Price modellingAnalysis & ProcessesThe margin effect of a price change, a new tier or a hierarchy change modelled on the business's own transactions before approval
17Ar Agreement registerCustomer AgreementsEvery contract and special price recorded with an owner and an end date, and nothing migrated without both
22Rs Roles and decision rightsManagement AlignmentA named pricing owner for the system transition, with the right to sign off the design and the test

06How it is treated: three kinds of work, in order.

Strategy is a set of decisions the chief executive makes before the integrator is briefed. Structure is a set of designs the CFO and the pricing owner hand to the build team as a specification. Operations is a set of routines that run from the first day of testing and continue after go-live. The order matters, because a hierarchy loaded before anyone has decided how prices will be managed is one the business will report from for a decade.

1

Strategy

Decisions for the chief executive

Three decisions, two pages. Each can be made before the next steering committee meeting.

Name the pricing owner for the transition and give that person a seat on the project.

One person owns the pricing specification from design to go-live and signs off the test. That person is named in the project charter. Value-Based Culture & Transformation →

Map today's pricing logic before anything is migrated.

Current price lists, special prices, discount rules, rebates and cost sources documented, with the number of costs held for each item. The map is the baseline for the design and the test. Strategic EBIT Opportunity & Risk Diagnostic →

Decide what will not be migrated.

Special prices with no owner, no end date or no sales in the past twelve months are retired, not carried across. The decision is made once, so no account manager has to defend it customer by customer. Value-Based Culture & Transformation →

The chief executive's question

If the new system went live on Monday with today's data, which price would it give our largest customer for our best-selling item, and could anyone in the room explain why?

2

Structure

Designs for the CFO and the pricing owner

Three designs. Each replaces a record held in someone's head or spreadsheet with a rule the new system enforces.

Design the target architecture before the build starts.

Product and customer trees, tiers, floors, stacking rules and approval limits, agreed with sales and finance and written as one document the integrator configures to. Value-Based Culture & Transformation →

Clean the data to one cost and one price per item.

One current cost per item, including freight where it is material; each product and customer in one place in its tree; start and end dates on every contract and special price. New tiers and floors are modelled on last year's transactions first. EBITDA Improvement Program →

Hand the design to the integrator as a specification they can test against.

A document the build team can configure from, with a basket of known quotes and their correct prices as the acceptance test, and a pricing owner named for each transition. Value-Based Culture & Transformation →

The CFO's question

How many cost prices does the project plan to migrate for each item, and which one will the margin report use?

3

Operations

Routines for the sales director and the pricing owner

Three routines. Each begins during testing and continues after go-live, with one owner and a report someone reads.

Test the system against a basket of real quotes before every release.

Fifty quotes from last quarter, with the price each should produce under the new rules. Any difference is fixed before go-live. Value-Based Culture & Transformation →

Check invoiced prices against agreed prices every month until the errors clear.

Finance compares each month's invoices with the price list, the agreements and the floor, and reports the count of differences until it reaches zero. Strategic EBIT Opportunity & Risk Diagnostic →

Train the people who will quote from the new system in the rules it enforces.

Sellers and customer service staff learn the floors, the approval limits and why the discount now has to be earned, using their own accounts. Negotiation Training & Value-Based Selling →

The sales director's question

When the new system refuses a price my team wants to give, who answers the phone, and how quickly?

07Businesses that acted, and what came of it.

Corporate Express Australia, later Staples, was about to move its pricing onto a new ERP system and carried around 60 price lists into its pricing review. Pricing Insight replaced cost-plus pricing and the 60 lists with one national price structure, designed the list and discount logic into the new system before it went live, and set up a central pricing team. A$6.8 million of EBITDA was realised within 12 months. The figure is realised, and the case is published on this site. The structure was designed first, then the prices were set, then the system was loaded.

At Allegion, an acquisition left the door hardware business with four price lists for three merged businesses. Project Blackbird modelled A$3.6 million of annual EBIT from one price architecture in August 2020, and new list prices for 5,300 items went live from November 2020. The figure is modelled, and the case is published on this site. One architecture was agreed before any list price was set.

Bunzl Outsourcing Services priced 18,000 items on value rather than cost, and A$5.7 million of EBIT improvement was realised; the case is published on this site. A range of that size cannot be priced item by item in a spreadsheet. It needs a product tree with levels at which a rule can be applied, and a system that applies it on every quote.

Reading the results

Each result is labelled. Realised means measured against a finance-agreed baseline after the change. Projected means modelled before it. Identified means sized in a diagnostic and not yet acted on. The labels matter more than the numbers.

Five questions to ask on Monday
  1. How many cost prices exist for our ten best-selling items?
  2. Does our product hierarchy carry at least four levels, so price can be managed at family level?
  3. How many contracts and special prices have no end date?
  4. How many re-typing steps sit between a quote and an invoice?
  5. Who is the named pricing owner for the system transition?

08Questions a chief executive asks about this problem

When should pricing design happen in an ERP project?

Before the build phase. Hierarchies, tiers, floors and approval rules are configuration decisions; changing them after go-live means change requests, retesting and retraining. The design is signed before the integrator starts configuring, so it is the specification rather than a change request.

What data checks come first?

Three: one current cost per item; each customer and product in one place in its tree; and start and end dates on every contract and special price. Until those hold, every rule in the new system applies to a record that may be wrong.

Should existing special prices be migrated?

Only those with an owner, an end date and recent sales. Dormant lines with no sales in twelve months are retired before migration rather than carried into the new system.

Can the system integrator do the pricing design?

No. Integrators configure what they are given and test that it works as specified. Deciding what the floors, tiers and approval limits should be is a commercial decision for the business, and sales and finance must agree it before it is written down.

What should the pricing workstream deliver before the build starts?

Four things: a map of today's pricing logic; a target design for trees, tiers, floors, stacking rules and approval limits; a cleaned item and customer master with one cost and one price per item; and a basket of real quotes with their correct prices as the acceptance test. A named owner signs off each.

09How Pricing Insight treats it

The starting point is the business's own price files, cost records and agreements, not the integrator's template. Each engagement runs in three stages, and the third keeps the first two in the system after go-live.

1

Diagnose

We map today's pricing logic: price lists, special prices, discount rules, rebates and cost sources, with the number of costs held for each item and the agreements with no end date. The output is a register of what the new system would inherit, with an owner for each item. Strategic EBIT Opportunity & Risk Diagnostic →

2

Optimise

We design the target architecture: product and customer trees, tiers, floors, stacking rules and approval limits agreed with sales and finance, with the margin effect of each modelled on the business's own transactions, and the list prices set on one architecture. EBITDA Improvement Program →

3

Transform

We hand the design to the integrator as a specification the build team can configure and test against, with a pricing owner named for each transition, and we set up the invoice check and the training that keep the rules in use after we leave. Value-Based Culture & Transformation →

Results on this problem

Which pricing decisions will your new system make, and who has decided them?

The first conversation covers where your upgrade is up to, who owns pricing in the project, how many costs are held for each item, and what the design must contain before the integrator is briefed. Ron Wood, +61 410 534 099.

Contact Pricing Insight

Further reading

Related problems

About the author

Ron Wood is the Founder and Managing Director of Pricing Insight, an Australian pricing strategy consultancy he established in 2007. He has worked in pricing for around 30 years, first as a pricing and commercial manager in consumer goods, building materials and capital equipment, and since then across more than 160 pricing engagements in Australia, New Zealand, South East Asia, India, the United States and the United Kingdom. He is the author of B2B Pricing Insight and the Pricing Periodic Table, and founded Pricing University, which has trained more than 5,000 executives.

To discuss how this applies to your business, contact Ron Wood at info@pricinginsight.com.au or on +61 410 534 099, or visit Pricing Insight.

Diagnostic findings are from Pricing Insight's cross-client issues register of staff survey comments and technique scores; they describe how often an issue was raised, not its dollar size. Businesses are described by sector and not named; quotations are reproduced as written, with obvious typing errors corrected. The margin arithmetic in Figure 1 and the scaled example after it are illustrative. Case results are labelled as stated on the linked case-study pages: Staples A$6.8m EBITDA realised within 12 months; Allegion A$3.6m annual EBIT modelled; Bunzl A$5.7m EBIT realised. The elements and the ten-point test quotation are from B2B Pricing Insight (Pricing Insight, 2026).

Let’s work together

Whether you're ready to optimise your pricing or want to explore what's possible, we'd love to hear from you.

Follow us on
Pricing Insight

Thank you

Thanks for reaching out. We will get back to you soon.
Oops! Something went wrong while submitting the form.
Pricing Insight