Price setting and price architecture · 19 min read
Every job is quoted by hand
Good quoting rules make the right price the fastest one to give. Estimators keep their judgement for the large and unusual jobs, and routine work is priced the same way every time.
Source: Pricing Insight diagnostic issues register, drawn from staff surveys in building products, rural supplies, hardware retail and distribution, security hardware, medical products, office technology and coatings; clients are described by sector and not named. The contract arithmetic is illustrative. The insulation result is published on this site.
- When a control slows the quote, staff work around it. Make the approved price the fastest one to give.
- Every project price needs a project number, a quantity and an end date. Without them, the price outlives the project.
- The fix is base prices by job type, floors above the cost of doing business, a fast deal desk and a log of won and lost quotes, resting on ten of the 61 elements of the Pricing Periodic Table.
In Pricing Insight's diagnostics, prices and quotes managed in spreadsheets outside the system are among the ten issues raised most often, and the issue was raised in every business we have measured. Beside it sit the absence of a price corridor, raised in seven of the eight businesses, and the cost of serving a customer left out of the price, raised in all eight. A job-quoting business carries all three at once, because every quote is a price set from scratch.
This page sets out what is changing in markets that buy by quote and tender, what the diagnostic evidence shows, what a final-offer concession costs on a won contract, what good quoting looks like, the elements of the Pricing Periodic Table that decide the problem, and the decisions, designs and routines that fix it. It is written for the chief executive, the CFO and the sales director.
The question this page answers
Why do two of your estimators price the same job differently, what does it cost when they do, and how do you quote faster without giving margin away?
01Quoting by hand is slow, uneven and getting harder to staff.
Project and contractor customers run more competitive tenders than they did, with shorter turnarounds, more requests for a best and final offer and more variations after award. Experienced estimators are retiring, and their judgement leaves with them. Where the list price has drifted from the market, every sale becomes a quote.
Six signs show the problem is present. Two estimators would price the same job differently. Quoted margins range widely on similar work, and large projects carry lower margins than small ones. Freight, risk and variations are left out of the quote. Quotes are built in spreadsheets outside the system and skip approval. Project prices stay live after the job ends and miss every annual increase. Competitors quote in a day or two while yours take a week.
Left alone, the margin on won work comes in below what the quote suggested. Reps cut price to rescue deals that sat in the approval queue, and learn to quote low the first time to avoid a second round. Over time the business wins more of the work it prices worst.
Two decisions are hard to reverse. A low tender price on a large project becomes the reference for the next one. A special price that never ends becomes the real price list for some accounts, and a return to the standard price is treated as a price rise. B2B Pricing Insight (Pricing Insight, 2026) puts it in one line: "a price without an end date is a price for ever."
Recovering quote margin means rebuilding pricing logic job type by job type and retraining estimators while live tenders continue. Starting with a count of quotes built outside the system shows where to begin.
A business that quotes everything by hand has as many prices as it has estimators, and the lowest of them is the one customers learn to wait for.
02Our diagnostics find hand-built quotes in every business, and no corridor around them in most.
Six register issues make up this problem. Prices, quotes and rebates managed in spreadsheets, disconnected from the business system, is among the ten issues raised most often in our diagnostics and was raised in every business we have measured. No defined price corridor, meaning no floor, target or ceiling for a quote to sit inside, was raised in seven of the eight. The cost of serving a customer left out of the price, so that freight, returns and service are absorbed, was raised in all eight. So was pressure on price from long lead times and stock, where a seller concedes price to hold a customer waiting on supply.
Two more sit beside them. No discount authority matrix, so that the approval needed for a low quote is informal or absent, was raised in six of the eight businesses. Concessions given without an equivalent return, the give-get imbalance, was raised in three.
Staff raised these issues at a building products group with six business units, a hardware distributor, a security hardware manufacturer, a coatings manufacturer, a medical products company, an office technology company and two co-operatives in rural supplies and hardware retail.
Highly manual and no efficient workflow - pricing worked out manually in excel.
I feel we need more information to reference pricing ranges to work within.
Pricing controls at the front end, we seems to be trading down margin for no additional benefit.Staff comments from Pricing Insight diagnostic surveys, reproduced as written
When base prices no longer match the market, the pricing team spends its month processing quote requests instead of fixing the list. B2B Pricing Insight records an Australian maker of plastic pipe that quoted almost every customer one by one: "Pipe at the same price per tonne and a similar diameter could carry margins more than 10 points apart." The diagnostic projected about A$5.6 million a year of operating profit from better prices and a future increase program; that figure is projected, not measured.
In the building products group, everyday prices ran through a loaded tool that approved a quote automatically where the margin held. Project prices followed a different route: a spreadsheet template, attached to the record after the event, with the largest projects sent to the commercial team to price by hand. The jobs with the most margin at stake had the least control.
03A final-offer cut on a won contract costs a tenth of its gross profit.
Three numbers. Quoting rules protect margin on every job, including the ones that are won. Take a three-year contract at A$2 million a year and a 30 per cent gross margin. Revenue over the term is A$6 million and gross profit is A$1.8 million. A 3 per cent cut at the final-offer stage takes A$180,000 off the price and A$180,000 off the gross profit, leaving about A$1.6 million. That is a tenth of the contract's gross profit, given away in the last conversation before award.
The third number is the volume the cut must bring in. Extra volume equals the discount divided by the gross margin less the discount: 3 divided by 27, or about 11 per cent. To earn the same A$1.8 million of gross profit after the cut, the contract would need to grow to about A$6.67 million of revenue over its term. Tenders are fixed in scope, so the volume is not there, and the A$180,000 is gone.
Two more costs sit outside the arithmetic. Freight, risk and variations left out of the quote are paid by the supplier at cost, so a quote that looked like 30 per cent can invoice at 25. And a project price with no end date misses every annual increase: a A$500,000 a year project price that misses one 4 per cent rise and stays live for two more years forgoes about A$40,000, which is A$20,000 in each of those years. Both figures are illustrative.
Pull the last twelve months of won quotes. For each job type, set the margin quoted beside the margin invoiced once freight, variations and credits are in. Count the quotes built outside the system. List every project price with no end date and no sales in the last twelve months. The three lists are the size of the problem.
04Good quoting prices routine work by rule and keeps judgement for the exceptions.
Six things, in order. Each takes a decision the business already has the data to make, and each removes one reason for an estimator to start from a blank sheet.
Base prices by job type, adjusted for urgency, specification and risk.
A standard job has a standard price. Adjustments for a short lead time, a non-standard specification or an unusual site are set as rules, so two estimators reach the same figure for the same job.
A floor margin by project size that sits above the full cost of doing business.
The floor covers freight, service, credit terms and the cost of variations, not just the cost of goods. Large projects earn a lower floor than small ones only where the cost of serving them is measured to be lower.
A bid decision before pricing.
Five tests before the estimator opens the job: a genuine buyer, winnable at margin, scope clear, the walk-away price set and the final-offer concession planned. A tender that fails two of the first three tests goes to the sales director or is declined.
Every project price carries a project number, a quantity and an end date.
The price applies to one job, for the quantity tendered, until the date the job is expected to finish. Orders outside those limits revert to the standard price, and nobody has to negotiate the return.
Turnaround reported beside win rate each month.
The time from request to quote, by job type and approval band, sits beside the win rate on one page. A control that approves nearly everything unchanged is a delay, and the report shows which limit to lift.
A tender log of won and lost prices.
Every tender recorded with its price, the winning price where known, the margin and the reason. Over a year the log shows the price range that wins by job type, which is the evidence the base prices are built from.
Estimators will say rules cannot price a complex job. They are right, and the rules are not for those jobs. Routine work priced by rule frees the estimator's time for the large and unusual jobs where judgement earns its keep.
05Ten elements of pricing capability decide whether quoting by hand is fixed.
Mapped to the Pricing Periodic Table, quoting by hand is decided by ten of the 61 elements, in five domains. Five concern how the quote is built and controlled; five concern what the seller knows and may do once a buyer pushes back. Each needs a decision, a loaded rule or a report someone reads.
Elements this problem turns on. The Pricing Periodic Table has 61 elements in nine domains across Value, People and Structures; it is the map of B2B Pricing Insight.
| Element | Domain | What it looks like when it holds |
|---|---|---|
| 58Qt Quoting speed and tools | Systems & Controls | The approved price is the fastest one to produce, with margin, floor and history on the quote screen |
| 18Tp Tender and project pricing | Customer Agreements | Project prices with a project number, a quantity, a validity date and an escalation clause |
| 40Dd Deal desk and negotiation governance | Market, Sales & Negotiation | Standard deals answered the same day, so nobody needs to work around the desk |
| 35Wa Walk-away and alternatives | Market, Sales & Negotiation | A margin floor for each job type, below which work is declined, set before the tender is priced |
| 37Bt Buyer and procurement tactics | Market, Sales & Negotiation | A prepared response to each tactic buyers use, including the best and final offer |
| 54Co Price corridors and exceptions | Price Architecture | A target, floor and ceiling for each job type and project size, with every exception logged |
| 61Da Discount authority and controls | Systems & Controls | Approval limits that scale with deal size and depth, loaded so a quote below the floor cannot be issued unapproved |
| 53Sx Charges for services and extras | Price Architecture | Freight, urgency, variations and small orders charged as lines on the quote, not absorbed |
| 45Pr Cost to serve and profitability | Analysis & Processes | The full cost of serving a project known by size and type, and built into its floor |
| 42Wl Win/loss analysis | Analysis & Processes | A tender log of won and lost prices by job type, read monthly and used to reset the base prices |
06Three kinds of work fix it, and the order matters.
Strategy is decisions the chief executive writes down. Structure is designs the CFO and the pricing manager load into the quoting tool. Operations is routines that run on a calendar and produce a report. The order matters, because a quoting tool loaded before anyone has decided the floors is a faster way to issue the same low prices.
Strategy
Decisions for the chief executive
Three decisions, two pages. Each can be made with the won and lost quotes the business already holds.
Decide which work is priced by rule and which by judgement.
By job type and project size: the routine work that takes a base price and standard adjustments, and the large or unusual jobs that go to an estimator. Written down, so the estimator's time goes where it earns most. Strategic EBIT Opportunity & Risk Diagnostic →
Set the floor margin by project size, above the full cost of doing business.
A floor that covers freight, credit terms, service and variations, not just the cost of goods, with a lower floor for large projects only where the cost of serving them is measured to be lower. EBITDA Improvement Program →
Set the bid rule and the three limits on every project price.
No tender is priced until it passes the bid tests, and no project price is issued without a project number, a quantity and an end date. The rule is signed by the chief executive and applies to the largest customer as much as the smallest. Value-Based Culture & Transformation →
If two estimators priced our largest job type this week, how far apart would they be, and which of the two prices would we invoice?
Structure
Designs for the CFO and the pricing manager
Three designs. Each replaces a judgement made under time pressure with a rule the quoting tool enforces.
Build base prices by job type and load the adjustments.
A standard price for each job type, with set adjustments for urgency, specification and risk, and charges for freight and variations as lines on the quote. Estimators work inside the rules; the rules do the routine arithmetic. EBITDA Improvement Program →
Load approval limits that scale with deal size.
The estimator inside the corridor; the sales manager a little below it; the sales director with the pricing manager further down; the deal desk, with a written case, beyond that. Loaded in the quoting tool so a price below the floor cannot be issued without a named approver. Value-Based Culture & Transformation →
Give every project price an end date in the system.
Project number, quantity and end date are fields on the price record, not notes on an email. When the date passes or the quantity is reached, the price reverts to standard. Strategic EBIT Opportunity & Risk Diagnostic →
How many of our live project prices have no end date, and what would each of them have collected if it had taken the last two annual increases?
Operations
Routines for the sales director and the pricing team
Three routines. Each has one owner and produces a report someone reads.
Run the deal desk to a same-day answer.
Standard requests answered the same day by a named approver; large or unusual jobs worked through with an analyst. Any band that approves nearly everything unchanged has its limit lifted. Value-Based Culture & Transformation →
Keep the tender log and read it monthly.
Won and lost prices by job type go to the pricing council each month, and the base prices are reset from them. Strategic EBIT Opportunity & Risk Diagnostic →
Train everyone who quotes in the walk-away and the final offer.
The bid tests, the floor for each job type, the planned final-offer concession and the response to each buyer tactic, taught on the business's own tenders with a test at the end. Authority to quote is tied to a pass. Negotiation Training & Value-Based Selling →
Of the last ten tenders we lost, how many did we lose on price, by how much, and did we record the winning price anywhere?
07Businesses that acted, and what came of it.
At Fletcher Insulation, a pricing diagnostic found no base list price and a pricing function carried by one analyst, with customers largely priced individually and job prices worked out by hand. A new pricing structure, a price increase and less discounting followed, worth 250 basis points of gross margin and about A$2.25 million of annualised EBITDA. That result is realised, and the case is published on this site.
At Hyster-Yale Asia Pacific, discounting to build an installed base was leaving manufacturer unit sales unprofitable. A central deal desk, discount rules, configuration-profit models and electronic price and quote tools moved the business from a A$100,000 EBIT loss to about A$3 million of EBIT gain within 12 months. That figure is realised.
Three more businesses that sell by tender or quote have had the problem sized but not yet measured after the change. At Multigate, an assessment of tender and pack pricing identified A$4.2 million to A$6.8 million of EBIT improvement potential. At NEXON Asia Pacific, service-bundle economics, governance and quoting identified A$2.7 million to A$5.1 million of annualised EBIT. At InfraBuild Reinforcing, a A$600 million steel reinforcing business that priced on tonnes, a diagnostic identified A$7 million to A$10 million of margin potential. Each of those three figures is identified, not realised.
Ron Wood's view, from the engagements behind these cases: "When a control slows the quote, staff work around it. Make the approved price the fastest one to give. A price built from cost invites a debate about cost."
Each result is labelled. Realised means measured against a finance-agreed baseline after the change. Projected means modelled before it. Identified means sized in a diagnostic and not yet acted on. The labels matter more than the numbers.
08Questions a chief executive asks about this problem
- How many quotes last month were built outside the system?
- How many approval requests did we receive last month, and how many were approved without change?
- What is the oldest project or tender price still in use, and has it had every increase since?
- For the next tender due, have we set the walk-away price and the final-offer concession?
- How does our quote turnaround compare with our win rate?
How do you speed up quoting without losing control?
Measure turnaround, count the approval requests in each band, and lift any limit that approves nearly everything unchanged. A control that approves almost everything is a delay, not a control. The control that remains should sit only on prices below the floor, where the margin is at stake.
What should a project price include?
A project number, a quantity, an end date, a floor margin for its size, and charges for freight and variations. Without an end date, a project price becomes a standing discount, and the business pays for it again at every annual increase it misses.
When should a business decline to bid?
When a tender fails two of the first three tests: a genuine buyer, a job winnable at margin and a clear scope. Those bids go to the sales director or are declined. The time saved goes to the tenders the business can win at margin.
Why do large projects carry lower margins than small ones?
Because the floor is set by negotiation rather than by cost. A large project usually costs less per dollar to serve, so some reduction is justified, but the reduction should be measured and set in advance. Where it is not, the largest jobs are priced under the most pressure, and the buyer's final-offer request takes the rest.
Who should approve a quote below the floor?
A named approver at each band, with the band set by deal size and depth below the floor. The estimator inside the corridor, the sales manager a little below it, the sales director with the pricing manager further down, and the deal desk with a written case beyond that. The approver's name and reason stay on the quote record.
09How Pricing Insight treats it
The starting point is the business's own won and lost quotes, not a template. Each engagement runs in three stages, and the third makes the first two last.
Diagnose
We analyse won and lost quotes: the price range that wins by job type, where margin was given away in freight, risk and variations, how many quotes were built outside the system and how many project prices have no end date. The output is a sized register of quote margin at risk with an owner for each item. Strategic EBIT Opportunity & Risk Diagnostic →
Optimise
We set the quoting rules: base prices by job type, floors by project size, charges for variations, a bid decision before pricing and approval limits that scale with deal size, then price the range to value and pricing power line by line where the data supports it. EBITDA Improvement Program →
Transform
We build the rules into the quoting tool, so estimators work inside them, project prices carry end dates and exceptions go to a named approver who answers the same day, and we train everyone who quotes on their own tenders. Value-Based Culture & Transformation →
Results on this problem
How far apart would two of your estimators be on the same job?
The first conversation covers how your business quotes today, who approves a price below the floor, how long a quote takes, and what the won and lost quotes would need to show before anything changes. Ron Wood, +61 410 534 099.
Further reading
Related problems
Ron Wood is the Founder and Managing Director of Pricing Insight, an Australian pricing strategy consultancy he established in 2007. He has worked in pricing for around 30 years, first as a pricing and commercial manager in consumer goods, building materials and capital equipment, and since then across more than 160 pricing engagements in Australia, New Zealand, South East Asia, India, the United States and the United Kingdom. He is the author of B2B Pricing Insight and the Pricing Periodic Table, and founded Pricing University, which has trained more than 5,000 executives.
To discuss how this applies to your business, contact Ron Wood at info@pricinginsight.com.au or on +61 410 534 099, or visit Pricing Insight.
Diagnostic findings are from Pricing Insight's cross-client issues register of staff survey comments and technique scores; they describe how often an issue was raised, not its dollar size. Businesses are described by sector and not named; quotations are reproduced as written. Case results are labelled realised or identified as stated on the linked case-study pages: Fletcher Insulation and Hyster-Yale Asia Pacific realised; Multigate, NEXON Asia Pacific and InfraBuild Reinforcing identified. The contract, break-even, freight and project-price arithmetic is illustrative and not a client result. The plastic pipe figure of about A$5.6 million a year is projected, as labelled in its source, and the business is not named there. The elements and book quotations are from B2B Pricing Insight (Pricing Insight, 2026).